Maritime

Maritime

Maritime

91 Apartments

16 Levels

The site was a tricky one as it was sandwiched between existing buildings at the base of a substantial slope with extremely limited site access and it was very close to the water table.  The logistics of the excavation determined a number of the design decisions and informed the design.

29-31 Anzac Ave

Project Status: Project cancelled               

PB&A Team: Matthew Simpson, Paul Brown

Project Partners: Calibre, DCS Planners, Aurecon, Lautrec, Coffey, No builder

Client:  The Maritime Apartments Ltd