Maritime
91 Apartments
16 Levels
The site was a tricky one as it was sandwiched between existing buildings at the base of a substantial slope with extremely limited site access and it was very close to the water table. The logistics of the excavation determined a number of the design decisions and informed the design.
29-31 Anzac Ave
Project Status: Project cancelled
PB&A Team: Matthew Simpson, Paul Brown
Project Partners: Calibre, DCS Planners, Aurecon, Lautrec, Coffey, No builder
Client: The Maritime Apartments Ltd